Narrative:

Just after passing ZZZ intersection we received an amber 'hydraulic 1 lo qty' cas message. We then displayed the hydraulic synoptic on the #4 du for review and initiated the appropriate checklist. On the synoptic; we noticed the hydraulic system 1 quantity at 16% fluid and depleting rapidly. Anticipating total fluid loss we reviewed the hydraulic 1 lo press checklist as a precaution; discussed situation; and elected to divert the aircraft to ZZZZ. In the descent to ZZZZ and hydraulic system 1 quantity at 6%; we started the APU and elected to perform a precautionary shutdown of the #1 engine. This was done after discussion and systems review to prevent possible further safety issues and aircraft system damage. [ATC was advised] at this time to ensure flight safety and priority handling. Shortly after precautionary engine shutdown; the quantity and pressure on hydraulic system 1 fully depleted. We then completed all appropriate single engine approach and landing checklists and subsequent single engine landing at ZZZZ with no further flight issues.

Google
 

Original NASA ASRS Text

Title: A Bombardier Global Express HYD 1 LO QTY CAS alerted so the crew completed the HYD 1 LO PRESS Checklist. They then secured the #1 engine as a precaution and diverted to the nearby airport.

Narrative: Just after passing ZZZ Intersection we received an amber 'HYD 1 LO QTY' CAS message. We then displayed the hydraulic synoptic on the #4 DU for review and initiated the appropriate checklist. On the synoptic; we noticed the hydraulic system 1 quantity at 16% fluid and depleting rapidly. Anticipating total fluid loss we reviewed the HYD 1 LO PRESS checklist as a precaution; discussed situation; and elected to divert the aircraft to ZZZZ. In the descent to ZZZZ and hydraulic system 1 quantity at 6%; we started the APU and elected to perform a precautionary shutdown of the #1 engine. This was done after discussion and systems review to prevent possible further safety issues and aircraft system damage. [ATC was advised] at this time to ensure flight safety and priority handling. Shortly after precautionary engine shutdown; the quantity and pressure on hydraulic system 1 fully depleted. We then completed all appropriate single engine approach and landing checklists and subsequent single engine landing at ZZZZ with no further flight issues.

Data retrieved from NASA's ASRS site and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.