Narrative:

An aircraft was inbound to elmendorf AFB (edf) via ILS runway 6. This final approach course is protected from VFR traffic via far-93. Coordination with merrill field (mri) airport traffic control tower (ATCT) by landline is required to allow/restrict aircraft VFR from penetrating the far-93 with or without coordination. I called mri to make them 'red light'; instead of saying 'red light' I said 'green light'.stopping departures and restricting lake hood (lhd) VFR traffic into and out of the far-93 is an automated button. We could possibly use the same button or another button to indicate red lights for mri and anc.

Google
 

Original NASA ASRS Text

Title: Two A11 TRACON controllers reported a communication breakdown with the nearby MRI Tower Controller during the coordination of a military airport arrival.

Narrative: An aircraft was inbound to Elmendorf AFB (EDF) via ILS Runway 6. This final approach course is protected from VFR traffic via FAR-93. Coordination with Merrill Field (MRI) Airport Traffic Control Tower (ATCT) by landline is required to allow/restrict aircraft VFR from penetrating the FAR-93 with or without coordination. I called MRI to make them 'red light'; instead of saying 'red light' I said 'green light'.Stopping departures and restricting Lake Hood (LHD) VFR traffic into and out of the FAR-93 is an automated button. We could possibly use the same button or another button to indicate red lights for MRI and ANC.

Data retrieved from NASA's ASRS site and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.