37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
Attributes | |
ACN | 1461012 |
Time | |
Date | 201707 |
Local Time Of Day | 1801-2400 |
Place | |
Locale Reference | CDB.Airport |
State Reference | AK |
Environment | |
Flight Conditions | VMC |
Light | Daylight |
Aircraft 1 | |
Make Model Name | Small Aircraft Low Wing 1 Eng Fixed Gear |
Operating Under FAR Part | Part 91 |
Flight Phase | Landing |
Route In Use | None |
Flight Plan | VFR |
Person 1 | |
Function | Flight Service |
Qualification | Air Traffic Control Fully Certified |
Experience | Air Traffic Control Time Certified In Pos 1 (yrs) 9 |
Events | |
Anomaly | ATC Issue All Types Conflict Ground Conflict Critical Deviation - Procedural Clearance Ground Incursion Runway |
Narrative:
Aircraft X landed on the runway for taxi to parking. A construction vehicle drove across the runway in front of the aircraft rolling out. The truck was not in radio contact with the FSS. The pilot asked why a truck pulled out in front of him and the point of contact for the construction vehicles advised the truck should not have been there. This is the last of an unknown; but substantial number of similar occurrences since construction began.address contract violations permitted by the airport crew foreman and require published construction procedures be adhered to.
Original NASA ASRS Text
Title: A Flight Service Station Specialist reported receiving a report from an aircraft that a construction vehicle entered the runway while they were landing.
Narrative: Aircraft X landed on the runway for taxi to parking. A construction vehicle drove across the runway in front of the aircraft rolling out. The truck was not in radio contact with the FSS. The pilot asked why a truck pulled out in front of him and the point of contact for the construction vehicles advised the truck should not have been there. This is the last of an unknown; but substantial number of similar occurrences since construction began.Address contract violations permitted by the airport Crew Foreman and require published construction procedures be adhered to.
Data retrieved from NASA's ASRS site and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.