Narrative:

When approaching hpn on left base vectors for the ILS 16; westchester tower asked us to square up our base and slow to minimum speed for a cessna to land on runway 11 prior to our arrival. We squared up our base and slowed to 130 knots before being cleared for the visual approach runway 16. We intercepted the localizer to back up the visual at the czimr;the final approach fix; slowed to our final approach speed of 112kts and were subsequently cleared to land runway 16. Upon touchdown and rollout; still at high speed; we were instructed 'you don't need to read this back; but hold short of runway 11 for landing traffic'. As it wasn't given to us as an option but a clearance and we were not in a position to execute a go around; I maximized braking and was able to stop prior to and hold short of runway 11 for the crossing traffic. My concern was that a lahso clearance was given to us after touchdown without giving us the option; which could have led to a runway incursion or conflict with cross runway traffic.

Google
 

Original NASA ASRS Text

Title: Corporate jet flight crew reported ATC issued land and hold short off clearance; at touchdown and rollout while at high speed. Crew reported they were not given an option to readback or comply.

Narrative: When approaching HPN on left base vectors for the ILS 16; Westchester Tower asked us to square up our base and slow to minimum speed for a Cessna to land on Runway 11 prior to our arrival. We squared up our base and slowed to 130 knots before being cleared for the visual approach Runway 16. We intercepted the localizer to back up the visual at the CZIMR;the final approach fix; slowed to our final approach speed of 112kts and were subsequently cleared to land Runway 16. Upon touchdown and rollout; still at high speed; we were instructed 'You don't need to read this back; but hold short of Runway 11 for landing traffic'. As it wasn't given to us as an option but a clearance and we were not in a position to execute a go around; I maximized braking and was able to stop prior to and hold short of runway 11 for the crossing traffic. My concern was that a LAHSO clearance was given to us after touchdown without giving us the option; which could have led to a runway incursion or conflict with cross runway traffic.

Data retrieved from NASA's ASRS site and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.