Narrative:

Gate ramp striping in alb not sufficient to handle the operation; mainline operations on gate is a concern as jet bridge hits a hard limit before being able to properly mate to aircraft. Need complete re-work of ramp striping; planning and design.

Google
 

Original NASA ASRS Text

Title: Jet bridge operator reported the gate stripes at ALB need re-work.

Narrative: Gate ramp striping in ALB not sufficient to handle the operation; mainline operations on gate is a concern as Jet Bridge hits a hard limit before being able to properly mate to aircraft. Need complete re-work of ramp striping; Planning and Design.

Data retrieved from NASA's ASRS site and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.