Narrative:

While on the RNAV Z runway 9 at tex; we descended from 13000 ft. And leveled off at 12900 ft. Shortly after this I noticed we began descending again. Confused by this I double checked our position and the approach plate and realized we were descending prior to the final approach fix. I voiced my concerns to the PIC that we should still be at 12900 ft; the PIC immediately agreed and began a climb back to 12900 ft. The correction was made between 12200 ft. And 11900 ft.

Google
 

Original NASA ASRS Text

Title: Small Transport First Officer reported an altitude deviation occurred on the RNAV Z Approach to Runway 9 at TEX.

Narrative: While on the RNAV Z RWY 9 at TEX; we descended from 13000 ft. and leveled off at 12900 ft. Shortly after this I noticed we began descending again. Confused by this I double checked our position and the approach plate and realized we were descending prior to the final approach fix. I voiced my concerns to the PIC that we should still be at 12900 ft; the PIC immediately agreed and began a climb back to 12900 ft. The correction was made between 12200 ft. and 11900 ft.

Data retrieved from NASA's ASRS site and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.