Narrative:

Completed brief with ground crew for coordination; checked hand microphone captain side during preflight with ground crew; due to inoperative APU and push to talk switch on captain yoke. Completed all checklist; cleared to start number 1; first officer (first officer) began to start number 2 in error; ground crew and myself recognized error and immediately aborted start of number 2. Completed checklist again and correctly started number 1. Generator on number 1 was unable to carry electric load for required configuration and would be unsafe to power up engine at gate; so start was aborted and ground; operations; and maintenance were advised. Parking checklist completed aircraft grounded by maintenance with write-up of number one generator and passengers were deplaned and put on another aircraft along with crew.

Google
 

Original NASA ASRS Text

Title: B737 Captain reported the generator was unable to carry aircraft electrical load.

Narrative: Completed brief with ground crew for coordination; checked hand microphone Captain side during preflight with ground crew; due to INOP APU and push to talk switch on Captain yoke. Completed all checklist; cleared to start number 1; FO (First Officer) began to start number 2 in error; ground crew and myself recognized error and immediately aborted start of number 2. Completed checklist again and correctly started number 1. Generator on number 1 was unable to carry electric load for required configuration and would be unsafe to power up engine at gate; so start was aborted and ground; operations; and maintenance were advised. Parking checklist completed aircraft grounded by maintenance with write-up of number one generator and passengers were deplaned and put on another aircraft along with crew.

Data retrieved from NASA's ASRS site and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.