ACN | 1676039 |
Time | |
Date | 201908 |
Place | |
Locale Reference | ZZZZ.Airport |
State Reference | FO |
Aircraft 1 | |
Make Model Name | B747-400 |
Operating Under FAR Part | Part 121 |
Flight Phase | Takeoff |
Flight Plan | IFR |
Component | |
Aircraft Component | Electrical Distribution |
Person 1 | |
Function | Captain |
Qualification | Flight Crew Multiengine Flight Crew Instrument Flight Crew Air Transport Pilot (ATP) |
Person 2 | |
Function | Relief Pilot First Officer |
Qualification | Flight Crew Air Transport Pilot (ATP) Flight Crew Multiengine Flight Crew Instrument |
Experience | Flight Crew Last 90 Days 148 Flight Crew Total 20561 Flight Crew Type 890 |
Events | |
Anomaly | Aircraft Equipment Problem Critical Inflight Event / Encounter Fuel Issue |
Narrative:
Normal departure preparations were completed; engines started and we taxied to runway xx for departure. Take off was normal and as we were climbing out with an autopilot engaged the master caution/beeper activated with the autopilot disconnecting and numerous EICAS messages populating the upper screen and associated status messages on the lower screen. We continued the climb out; now getting vectors and using flch/heading sel as LNAV/VNAV was no longer working. We coordinated an intermediate level off with ATC and advised of an electrical issue and requested vectors to stay away from air corridors. It was determined upon inspection of the P6 panel that the #4 AC distribution bus circuit breaker (circuit breaker) had tripped. A call via satcom was placed to ground control and a three way call with dispatch and [maintenance control] was initiated. [Maintenance control] has us disconnect the #4 idg and reset the circuit breaker. It worked momentarily but once again tripped. As a result the flight could no longer continue to ZZZZ1 with degraded systems from the malfunctioning bus feed and a return to ZZZZ was coordinated with ATC. Fuel jettison was initiated (45 minutes) and upon completion of all QRH items and checklists and re-assessing the aircraft systems; an approach back into ZZZZ was prepared. The approach was normal and after rollout and taxi in the aircraft was shut down and secured. Maintenance was briefed after the appropriate log book entries made and the crew was subsequently released to rest.sops were followed and good crew coordination/ATC coordination allowed us to complete the task at hand with a positive outcome.
Original NASA ASRS Text
Title: A B747 flight crew reported observing numerous caution messages associated with a failed AC electric system bus; resulting in a return to the departure airport.
Narrative: Normal departure preparations were completed; engines started and we taxied to Runway XX for departure. Take off was normal and as we were climbing out with an autopilot engaged the master caution/beeper activated with the autopilot disconnecting and numerous EICAS messages populating the upper screen and associated status messages on the lower screen. We continued the climb out; now getting vectors and using FLCH/HDG SEL as LNAV/VNAV was no longer working. We coordinated an intermediate level off with ATC and advised of an electrical issue and requested vectors to stay away from air corridors. It was determined upon inspection of the P6 panel that the #4 AC distribution BUS CB (Circuit Breaker) had tripped. A call via satcom was placed to Ground Control and a three way call with Dispatch and [Maintenance Control] was initiated. [Maintenance Control] has us disconnect the #4 IDG and reset the CB. It worked momentarily but once again tripped. As a result the flight could no longer continue to ZZZZ1 with degraded systems from the malfunctioning BUS feed and a return to ZZZZ was coordinated with ATC. Fuel jettison was initiated (45 minutes) and upon completion of all QRH items and checklists and re-assessing the aircraft systems; an approach back into ZZZZ was prepared. The approach was normal and after rollout and taxi in the aircraft was shut down and secured. Maintenance was briefed after the appropriate log book entries made and the crew was subsequently released to rest.SOPs were followed and good crew coordination/ATC coordination allowed us to complete the task at hand with a positive outcome.
Data retrieved from NASA's ASRS site and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.