37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
Attributes | |
ACN | 1733397 |
Time | |
Date | 202003 |
Local Time Of Day | 1201-1800 |
Place | |
Locale Reference | OPF.Tower |
State Reference | FL |
Environment | |
Flight Conditions | VMC |
Light | Daylight |
Aircraft 1 | |
Make Model Name | Learjet 60 |
Operating Under FAR Part | Part 91 |
Flight Phase | Final Approach |
Flight Plan | IFR |
Person 1 | |
Function | Captain Pilot Not Flying |
Qualification | Flight Crew Instrument Flight Crew Multiengine Flight Crew Air Transport Pilot (ATP) Flight Crew Flight Instructor |
Experience | Flight Crew Last 90 Days 70 Flight Crew Total 4200 Flight Crew Type 100 |
Events | |
Anomaly | ATC Issue All Types Conflict Airborne Conflict Deviation - Procedural Clearance |
Miss Distance | Horizontal 3000 Vertical 0 |
Narrative:
We were cleared for ILS runway 12 at opf. I was PIC and pm (pilot monitoring) from right seat. Second pilot was PF (pilot flying) from left seat.the following sequence of events occurred:at 2;000 ft. On the approach; opf tower instructed us to climb to 2;500 ft. For traffic. PF initiated a climb. As we began climbing; TCAS issues a resolution advisory (RA) to descend. PF began to lower the nose; as pm notified opf tower that we received the RA. TCAS system changed its indication to command a climb. At the same time; pm acquired the traffic visually and notified PF that traffic was in sight. Traffic passed us on right side with about X mile separation. PF continued approach to normal landing.it would be very useful for ATC to receive live broadcast of TA RA from aircraft; so that controller can avoid issuing instructions that are contrary to TA RA.
Original NASA ASRS Text
Title: Lear 60 Captain reported receiving an RA on approach that was contrary to ATC instructions.
Narrative: We were cleared for ILS Runway 12 at OPF. I was PIC and PM (Pilot Monitoring) from right seat. Second pilot was PF (Pilot Flying) from left seat.The following sequence of events occurred:At 2;000 ft. on the approach; OPF tower instructed us to climb to 2;500 ft. for traffic. PF initiated a climb. As we began climbing; TCAS issues a Resolution Advisory (RA) to descend. PF began to lower the nose; as PM notified OPF Tower that we received the RA. TCAS system changed its indication to command a climb. At the same time; PM acquired the traffic visually and notified PF that traffic was in sight. Traffic passed us on right side with about X mile separation. PF continued approach to normal landing.It would be very useful for ATC to receive live broadcast of TA RA from aircraft; so that controller can avoid issuing instructions that are contrary to TA RA.
Data retrieved from NASA's ASRS site and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.