Narrative:

ATC was working multiple frequencies; and was task overloaded. At xa:30 local time with heavy thunderstorm activity I need to be able to effectively communicate with my controller. This was not possible today. Controller staffing needs to be returned to a safe level. We deserve that layer of safety and service.

Google
 

Original NASA ASRS Text

Title: Air carrier Captain reported not being able to talk to ATC due to Controller working multiple frequencies and being task overloaded.

Narrative: ATC was working multiple frequencies; and was task overloaded. At XA:30 Local time with heavy thunderstorm activity I need to be able to effectively communicate with my Controller. This was not possible today. Controller staffing needs to be returned to a safe level. We deserve that layer of Safety and Service.

Data retrieved from NASA's ASRS site and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.