|  | 37000 Feet | Browse and search NASA's Aviation Safety Reporting System | 
| 
 | 
| Attributes | |
| ACN | 1761108 | 
| Time | |
| Date | 202009 | 
| Local Time Of Day | 1201-1800 | 
| Place | |
| Locale Reference | ZZZZ.ARTCC | 
| State Reference | US | 
| Aircraft 1 | |
| Make Model Name | Commercial Fixed Wing | 
| Operating Under FAR Part | Part 91 | 
| Flight Phase | Climb | 
| Flight Plan | IFR | 
| Component | |
| Aircraft Component | Pressurization Outflow Valve | 
| Person 1 | |
| Function | First Officer | 
| Qualification | Flight Crew Air Transport Pilot (ATP) Flight Crew Instrument Flight Crew Multiengine | 
| Events | |
| Anomaly | Aircraft Equipment Problem Critical Deviation - Procedural Maintenance Deviation - Procedural Published Material / Policy | 
Narrative:
1. On departure from ZZZZ; around 8;000' the cabin altitude indication turned amber. 2. Around 15;000' the cabin altitude turned red; and there was a master warning EICAS message ( [ ] cabin altitude ) with the corresponding aural alerts 3. Crew performed the associated checklist for cabin altitude 4. An emergency was declared and the crew descended 10;000' 5. International relief officer contacted dispatch on the sat radio 6. Crew held; completed checklists; reviewed performance numbers; and set-up to return to ZZZZ 7. Crew received vectors for the ILS xxr into ZZZZ; and landed no further issues. 8. Maintenance met the airplane at parking spot X. 1.prior to handing out paperwork; the captain noticed a status message - 'outflow valve aft' 2. Maintenance came on the airplane and worked the issue; and ended up writing one MEL (MEL 21.31.03.03.02) 3. We departed with a MEL on the aft outflow valve; and ultimately ended up with the airplane not pressurizing correctly 4. After noticing the issue; followed by the master warning; the crew decided the best course of action was to return . Better communication between the maintenance team in ZZZ and the mechanics in ZZZZ. There seemed to have been a lapse in communication between the two groups. The ZZZZ mechanics looked to be rushed; and appeared to be struggling with accomplishing the MEL correctly.
Original NASA ASRS Text
Title: Heavy Air Carrier First Officer reported communication failure between foreign maintenance and company maintenance team resulting in failure to repair aircraft.
Narrative: 1. On departure from ZZZZ; around 8;000' the cabin altitude indication turned amber. 2. Around 15;000' the cabin altitude turned red; and there was a Master Warning EICAS message ( [ ] CABIN ALTITUDE ) with the corresponding aural alerts 3. Crew performed the associated checklist for CABIN ALTITUDE 4. An emergency was declared and the crew descended 10;000' 5. IRO contacted dispatch on the SAT radio 6. Crew held; completed checklists; reviewed performance numbers; and set-up to return to ZZZZ 7. Crew received vectors for the ILS XXR into ZZZZ; and landed no further issues. 8. Maintenance met the airplane at parking spot X. 1.Prior to handing out paperwork; the Captain noticed a status message - 'Outflow Valve Aft' 2. Maintenance came on the airplane and worked the issue; and ended up writing one MEL (MEL 21.31.03.03.02) 3. We departed with a MEL on the AFT outflow valve; and ultimately ended up with the airplane not pressurizing correctly 4. After noticing the issue; followed by the Master Warning; the crew decided the best course of action was to return . Better communication between the maintenance team in ZZZ and the mechanics in ZZZZ. There seemed to have been a lapse in communication between the two groups. The ZZZZ mechanics looked to be rushed; and appeared to be struggling with accomplishing the MEL correctly.
Data retrieved from NASA's ASRS site and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.