Narrative:

Propeller was due overhaul by sep/tue/92 or at 3000.0 hours, whichever occurs first. Date was missed in the maintenance planning, and the propeller was flown over the due time. Aircraft was grounded upon discovery of oversight. Total time on propeller was 2197.2 hours.

Google
 

Original NASA ASRS Text

Title: ATX SMT CARGO ACFT EXCEEDED THE PROP OVERHAUL TIME LIMITS.

Narrative: PROP WAS DUE OVERHAUL BY SEP/TUE/92 OR AT 3000.0 HRS, WHICHEVER OCCURS FIRST. DATE WAS MISSED IN THE MAINT PLANNING, AND THE PROP WAS FLOWN OVER THE DUE TIME. ACFT WAS GNDED UPON DISCOVERY OF OVERSIGHT. TOTAL TIME ON PROP WAS 2197.2 HRS.