Narrative:

Arrived at very hot steamy aircraft. APU deferred as inoperative for doors. Turned on switch, doors opened. Visually checked and inlet door opened, APU started and worked normally. Notified maintenance. Maintenance said try it again in dfw. Worked normally. Shut it down for maintenance to take a look. Found #2 fire bottle squib switch blown off bottle with damage to APU exhaust intake and halon feed tube to #2 engine. APU deferred on MEL 49-1. Should have been deferred on 49-2 APU. Doors inoperative collared circuit breakers.

Google
 

Original NASA ASRS Text

Title: PLT TECHNIQUE PREFLT PROCS OPERATED INOP APU. ACFT MAINT DISCREPANCY.

Narrative: ARRIVED AT VERY HOT STEAMY ACFT. APU DEFERRED AS INOP FOR DOORS. TURNED ON SWITCH, DOORS OPENED. VISUALLY CHKED AND INLET DOOR OPENED, APU STARTED AND WORKED NORMALLY. NOTIFIED MAINT. MAINT SAID TRY IT AGAIN IN DFW. WORKED NORMALLY. SHUT IT DOWN FOR MAINT TO TAKE A LOOK. FOUND #2 FIRE BOTTLE SQUIB SWITCH BLOWN OFF BOTTLE WITH DAMAGE TO APU EXHAUST INTAKE AND HALON FEED TUBE TO #2 ENG. APU DEFERRED ON MEL 49-1. SHOULD HAVE BEEN DEFERRED ON 49-2 APU. DOORS INOP COLLARED CIRCUIT BREAKERS.

Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.