37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
Attributes | |
ACN | 288531 |
Time | |
Date | 199411 |
Day | Fri |
Local Time Of Day | 1201 To 1800 |
Place | |
Locale Reference | airport : fod |
State Reference | IA |
Altitude | agl bound lower : 0 agl bound upper : 150 |
Environment | |
Flight Conditions | VMC |
Light | Daylight |
Aircraft 1 | |
Operator | common carrier : air carrier |
Make Model Name | Jetstream 31 |
Operating Under FAR Part | Part 135 |
Flight Phase | descent : approach |
Flight Plan | IFR |
Person 1 | |
Affiliation | company : air carrier |
Function | flight crew : first officer |
Qualification | pilot : commercial pilot : instrument pilot : cfi |
Experience | flight time last 90 days : 210 flight time total : 2000 flight time type : 350 |
ASRS Report | 288531 |
Person 2 | |
Affiliation | company : air carrier |
Function | flight crew : captain oversight : pic |
Qualification | pilot : cfi pilot : atp pilot : commercial |
Experience | flight time last 90 days : 225 flight time total : 5600 flight time type : 4000 |
ASRS Report | 289310 |
Events | |
Anomaly | aircraft equipment problem : critical other anomaly other |
Independent Detector | aircraft equipment other aircraft equipment : unspecified other flight crewa |
Resolutory Action | flight crew : declared emergency none taken : unable other |
Consequence | Other |
Supplementary | |
Primary Problem | Aircraft |
Narrative:
Approximately 150 ft AGL on short final to FOD runway 12, right engine failed. Due to critical phase of flight and short time period before touchdown, engine was not feathered and secured, and ATC was not contacted to declare an emergency even though this is not company (general operations manual) procedure. This was not done due to the short period of time available before touchdown and the phase of flight (landing). We were not even talking to ATC on final, we were on unicom for ZMP instruction. We felt this was the safest decision not to perform these required procedures due to the situation when the engine failed.
Original NASA ASRS Text
Title: FLC OF AN LTT LANDED WITHOUT FEATHERING THE PROP OR DECLARING AN EMER AFTER 1 ENG FLAME-OUT ON SHORT FINAL.
Narrative: APPROX 150 FT AGL ON SHORT FINAL TO FOD RWY 12, R ENG FAILED. DUE TO CRITICAL PHASE OF FLT AND SHORT TIME PERIOD BEFORE TOUCHDOWN, ENG WAS NOT FEATHERED AND SECURED, AND ATC WAS NOT CONTACTED TO DECLARE AN EMER EVEN THOUGH THIS IS NOT COMPANY (GENERAL OPS MANUAL) PROC. THIS WAS NOT DONE DUE TO THE SHORT PERIOD OF TIME AVAILABLE BEFORE TOUCHDOWN AND THE PHASE OF FLT (LNDG). WE WERE NOT EVEN TALKING TO ATC ON FINAL, WE WERE ON UNICOM FOR ZMP INSTRUCTION. WE FELT THIS WAS THE SAFEST DECISION NOT TO PERFORM THESE REQUIRED PROCS DUE TO THE SIT WHEN THE ENG FAILED.
Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.