37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
Attributes | |
ACN | 294438 |
Time | |
Date | 199501 |
Day | Fri |
Local Time Of Day | 0601 To 1200 |
Place | |
Locale Reference | airport : mgm |
State Reference | AL |
Altitude | agl bound lower : 800 agl bound upper : 3000 |
Environment | |
Flight Conditions | IMC |
Light | Daylight |
Aircraft 1 | |
Operator | general aviation : personal |
Make Model Name | Any Unknown or Unlisted Aircraft Manufacturer |
Operating Under FAR Part | Part 91 |
Flight Phase | cruise other descent : approach descent other |
Route In Use | enroute airway : mgm |
Flight Plan | IFR |
Person 1 | |
Affiliation | Other |
Function | flight crew : single pilot |
Qualification | pilot : instrument pilot : commercial |
Experience | flight time last 90 days : 60 flight time total : 1250 flight time type : 50 |
ASRS Report | 294438 |
Person 2 | |
Affiliation | Other |
Function | other personnel other |
Qualification | other other : other |
Events | |
Anomaly | non adherence : far other anomaly other |
Independent Detector | other flight crewa |
Resolutory Action | none taken : detected after the fact |
Consequence | Other |
Supplementary | |
Primary Problem | Aircraft |
Air Traffic Incident | Pilot Deviation other |
Narrative:
Aircraft was released from annual inspection. Aircraft logs were, however, not complete. IFR certification was due and was not performed, which was not known to me. I flew approximately 1 hour in IMC conditions. I shot the approach and missed at mvr due to low ceilings. I then flew to montgomery, al, and used the ILS approach and landed without incident. After returning to lal, a few days later, I went to get the aircraft logs and discovered the IFR certification was not done. Although the flight went smoothly, I violated an far by flying an aircraft on an IFR flight plan and in IMC conditions without a current IFR certification. The aircraft is now IFR certified. I accepted the aircraft on verbal assurance that everything had been done. I should have insisted on the aircraft logbooks to be completed before I flew the airplane, and I would have known the certification had been missed. I will not accept release of an aircraft from annual inspection with the logbooks completed again.
Original NASA ASRS Text
Title: PLT OF AN SMT TWIN OPERATED UNDER IFR WHEN THE ACFT WAS NOT RECERTIFIED FOR IFR.
Narrative: ACFT WAS RELEASED FROM ANNUAL INSPECTION. ACFT LOGS WERE, HOWEVER, NOT COMPLETE. IFR CERTIFICATION WAS DUE AND WAS NOT PERFORMED, WHICH WAS NOT KNOWN TO ME. I FLEW APPROX 1 HR IN IMC CONDITIONS. I SHOT THE APCH AND MISSED AT MVR DUE TO LOW CEILINGS. I THEN FLEW TO MONTGOMERY, AL, AND USED THE ILS APCH AND LANDED WITHOUT INCIDENT. AFTER RETURNING TO LAL, A FEW DAYS LATER, I WENT TO GET THE ACFT LOGS AND DISCOVERED THE IFR CERTIFICATION WAS NOT DONE. ALTHOUGH THE FLT WENT SMOOTHLY, I VIOLATED AN FAR BY FLYING AN ACFT ON AN IFR FLT PLAN AND IN IMC CONDITIONS WITHOUT A CURRENT IFR CERTIFICATION. THE ACFT IS NOW IFR CERTIFIED. I ACCEPTED THE ACFT ON VERBAL ASSURANCE THAT EVERYTHING HAD BEEN DONE. I SHOULD HAVE INSISTED ON THE ACFT LOGBOOKS TO BE COMPLETED BEFORE I FLEW THE AIRPLANE, AND I WOULD HAVE KNOWN THE CERTIFICATION HAD BEEN MISSED. I WILL NOT ACCEPT RELEASE OF AN ACFT FROM ANNUAL INSPECTION WITH THE LOGBOOKS COMPLETED AGAIN.
Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.