37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
Attributes | |
ACN | 306102 |
Time | |
Date | 199505 |
Day | Sat |
Local Time Of Day | 0601 To 1200 |
Place | |
Locale Reference | atc facility : txk |
State Reference | AR |
Environment | |
Flight Conditions | VMC |
Light | Daylight |
Aircraft 1 | |
Controlling Facilities | tower : txk |
Person 1 | |
Affiliation | government : faa |
Function | controller : radar |
Qualification | controller : radar |
Experience | controller radar : 4 |
ASRS Report | 306102 |
Person 2 | |
Affiliation | Other |
Function | controller : local |
Qualification | controller : non radar |
Events | |
Anomaly | non adherence : published procedure |
Independent Detector | other controllera |
Resolutory Action | none taken : anomaly accepted |
Consequence | Other |
Supplementary | |
Primary Problem | ATC Human Performance |
Air Traffic Incident | other |
Narrative:
I was working the txk-L0 sector at ZFW. I began coordinating arrival information to txk tower. The contractor at the tower had no idea what I was talking about -- no knowledge of the types of IFR approachs or procedures (other than the name and general direction the aircraft will be coming from). With only 30 days training, the contractors hired to replace FAA controllers under the guise of saving money, are a continued problem and a hazard to air safety. Callback conversation with reporter revealed the following information: cto examiner for txk tower stated all personnel that are certified at txk tower have been trained and are certified to work as controllers in a contract tower. Cto examiner felt this was an isolated incident.
Original NASA ASRS Text
Title: ARTCC ATCT INTERFAC COORD. INADEQUATE TRAINING AT CONTRACT TWR.
Narrative: I WAS WORKING THE TXK-L0 SECTOR AT ZFW. I BEGAN COORDINATING ARR INFO TO TXK TWR. THE CONTRACTOR AT THE TWR HAD NO IDEA WHAT I WAS TALKING ABOUT -- NO KNOWLEDGE OF THE TYPES OF IFR APCHS OR PROCS (OTHER THAN THE NAME AND GENERAL DIRECTION THE ACFT WILL BE COMING FROM). WITH ONLY 30 DAYS TRAINING, THE CONTRACTORS HIRED TO REPLACE FAA CTLRS UNDER THE GUISE OF SAVING MONEY, ARE A CONTINUED PROB AND A HAZARD TO AIR SAFETY. CALLBACK CONVERSATION WITH RPTR REVEALED THE FOLLOWING INFO: CTO EXAMINER FOR TXK TWR STATED ALL PERSONNEL THAT ARE CERTIFIED AT TXK TWR HAVE BEEN TRAINED AND ARE CERTIFIED TO WORK AS CTLRS IN A CONTRACT TWR. CTO EXAMINER FELT THIS WAS AN ISOLATED INCIDENT.
Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.