Narrative:

The problem arose from checklist not having ELT antenna reinstallation on it, and from not having ELT arm on it, after replacement of ELT in aircraft.

Google
 

Original NASA ASRS Text

Title: A COMMERCIAL FIXED WING SMA WAS RETURNED TO SVC AFTER AN EMER LOCATER XMITTER WAS INSTALLED WITH THE CHKLIST NOT CORRECTED.

Narrative: THE PROB AROSE FROM CHKLIST NOT HAVING ELT ANTENNA REINSTALLATION ON IT, AND FROM NOT HAVING ELT ARM ON IT, AFTER REPLACEMENT OF ELT IN ACFT.

Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.