Narrative:

Fluid leak written up. Contract maintenance signed off logbook as 'inspected, unable to determine source of leak. Technical services notified for a follow-up.' no corrective action was taken or documented. Aircraft flew to destination and was taken OTS for a hydraulic leak. Maintenance repaired line and svced hydraulics.

Google
 

Original NASA ASRS Text

Title: A FOKKER 100 HAD A LOGBOOK WRITE-UP ON A FLUID LEAK AND WAS WORKED BY A CONTRACT MECH WHO SIGNED OFF THE WRITE-UP WITH NO CORRECTIVE ACTION.

Narrative: FLUID LEAK WRITTEN UP. CONTRACT MAINT SIGNED OFF LOGBOOK AS 'INSPECTED, UNABLE TO DETERMINE SOURCE OF LEAK. TECHNICAL SVCS NOTIFIED FOR A FOLLOW-UP.' NO CORRECTIVE ACTION WAS TAKEN OR DOCUMENTED. ACFT FLEW TO DEST AND WAS TAKEN OTS FOR A HYD LEAK. MAINT REPAIRED LINE AND SVCED HYDS.

Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.