37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
Attributes | |
ACN | 421130 |
Time | |
Date | 199811 |
Day | Wed |
Local Time Of Day | 0601 To 1200 |
Place | |
Locale Reference | airport : geg |
State Reference | WA |
Altitude | agl bound lower : 0 agl bound upper : 0 |
Environment | |
Flight Conditions | Mixed |
Light | Daylight |
Aircraft 1 | |
Operator | common carrier : air carrier |
Make Model Name | Commercial Fixed Wing |
Flight Phase | ground : preflight |
Flight Plan | IFR |
Person 1 | |
Affiliation | company : air carrier |
Function | flight crew : captain oversight : pic |
Qualification | pilot : flight engineer pilot : cfi |
Experience | flight time last 90 days : 100 flight time total : 6100 flight time type : 3000 |
ASRS Report | 421130 |
Person 2 | |
Affiliation | company : air carrier |
Function | flight crew : first officer |
Qualification | pilot : commercial |
Events | |
Anomaly | non adherence : far other anomaly other |
Independent Detector | other flight crewa |
Resolutory Action | none taken : detected after the fact |
Consequence | Other |
Supplementary | |
Air Traffic Incident | other |
Narrative:
Went over 16 hour duty day. On a 3 leg trip, had 2 mechanicals which delayed flight. I was aware I was approaching 16 hour day, but I thought as long as I blocked in under 16 hours I was ok. (I did not realize I needed to add another 30 mins to my block-in at the termination point.)
Original NASA ASRS Text
Title: ACR PLT EXCEEDS 16 HR DUTY DAY AT GEG.
Narrative: WENT OVER 16 HR DUTY DAY. ON A 3 LEG TRIP, HAD 2 MECHANICALS WHICH DELAYED FLT. I WAS AWARE I WAS APCHING 16 HR DAY, BUT I THOUGHT AS LONG AS I BLOCKED IN UNDER 16 HRS I WAS OK. (I DID NOT REALIZE I NEEDED TO ADD ANOTHER 30 MINS TO MY BLOCK-IN AT THE TERMINATION POINT.)
Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.