Narrative:

Ship xyz flight WX ZZZ-abc. Maintenance in ZZZ called at departure time requesting to put APU on maintenance carry over. With dispatcher's concurrence, I had ZZZ put the APU on maintenance carry over (deterred item). After departure, the dispatcher found that the high pressure bleed was already on maintenance carry over per MEL. This MEL item requires a working APU for ETOPS operation.

Google
 

Original NASA ASRS Text

Title: A B767-300ER WAS DISPATCHED IN NON COMPLIANCE WITH A DEFERRED ITEM ON THE APU IN CONFLICT WITH THE MEL REQUIREMENTS.

Narrative: SHIP XYZ FLT WX ZZZ-ABC. MAINT IN ZZZ CALLED AT DEP TIME REQUESTING TO PUT APU ON MAINT CARRY OVER. WITH DISPATCHER'S CONCURRENCE, I HAD ZZZ PUT THE APU ON MAINT CARRY OVER (DETERRED ITEM). AFTER DEP, THE DISPATCHER FOUND THAT THE HIGH PRESSURE BLEED WAS ALREADY ON MAINT CARRY OVER PER MEL. THIS MEL ITEM REQUIRES A WORKING APU FOR ETOPS OP.

Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.