ACN | 465883 |
Time | |
Date | 200001 |
Day | Sat |
Local Time Of Day | 1801 To 2400 |
Place | |
Locale Reference | airport : zzz.airport |
State Reference | US |
Altitude | agl single value : 0 |
Environment | |
Light | Dusk |
Aircraft 1 | |
Operator | common carrier : air carrier |
Make Model Name | B747-100 |
Operating Under FAR Part | Part 121 |
Flight Phase | ground : maintenance ground : parked |
Flight Plan | IFR |
Person 1 | |
Affiliation | company : air carrier |
Qualification | technician : powerplant technician : airframe |
Experience | maintenance avionics : 4 maintenance technician : 11 |
ASRS Report | 465883 |
Person 2 | |
Affiliation | company : air carrier |
Function | maintenance : technician |
Qualification | technician : powerplant technician : airframe |
Events | |
Anomaly | aircraft equipment problem : critical maintenance problem : improper maintenance non adherence : published procedure non adherence : far |
Resolutory Action | none taken : detected after the fact |
Consequence | other other other other |
Factors | |
Maintenance | contributing factor : weather contributing factor : schedule pressure contributing factor : non availability of parts performance deficiency : repair performance deficiency : testing performance deficiency : installation performance deficiency : non compliance with legal requirements |
Supplementary | |
Problem Areas | Company Maintenance Human Performance Aircraft |
Primary Problem | Maintenance Human Performance |
Narrative:
Damaged spoiler found on walkaround after aircraft arrival. Persons involved with spoiler removal did not follow maintenance manual procedures. Safety tool not available at time of removal. Local management allowed individuals to proceed to get the aircraft fixed sooner, rather than wait until tool was available. First spoiler was damaged on installation and new spoiler and safety tool arrived next day, second spoiler was installed and aircraft was released for flight. Flight delay and later cancellation incurred.
Original NASA ASRS Text
Title: A B747-200 UNDERGOING A SPOILER REPLACEMENT USING UNAPPROVED PROCS AND NO AVAILABLE SAFETY TOOLS DAMAGED THE REPLACEMENT SPOILER.
Narrative: DAMAGED SPOILER FOUND ON WALKAROUND AFTER ACFT ARR. PERSONS INVOLVED WITH SPOILER REMOVAL DID NOT FOLLOW MAINT MANUAL PROCS. SAFETY TOOL NOT AVAILABLE AT TIME OF REMOVAL. LCL MGMNT ALLOWED INDIVIDUALS TO PROCEED TO GET THE ACFT FIXED SOONER, RATHER THAN WAIT UNTIL TOOL WAS AVAILABLE. FIRST SPOILER WAS DAMAGED ON INSTALLATION AND NEW SPOILER AND SAFETY TOOL ARRIVED NEXT DAY, SECOND SPOILER WAS INSTALLED AND ACFT WAS RELEASED FOR FLT. FLT DELAY AND LATER CANCELLATION INCURRED.
Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.