37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
Attributes | |
ACN | 469605 |
Time | |
Date | 200004 |
Day | Mon |
Local Time Of Day | 0601 To 1200 |
Place | |
Locale Reference | airport : zzz.airport |
State Reference | US |
Altitude | agl single value : 0 |
Environment | |
Light | Daylight |
Aircraft 1 | |
Operator | common carrier : air carrier |
Make Model Name | B757-200 |
Operating Under FAR Part | Part 121 |
Flight Phase | ground : maintenance ground : parked |
Flight Plan | IFR |
Person 1 | |
Affiliation | company : air carrier |
Function | maintenance : technician |
Qualification | technician : airframe technician : powerplant |
ASRS Report | 469605 |
Person 2 | |
Affiliation | company : air carrier |
Function | oversight : supervisor |
Qualification | technician : airframe technician : powerplant |
Events | |
Anomaly | aircraft equipment problem : less severe maintenance problem : improper documentation maintenance problem : improper maintenance non adherence : published procedure |
Independent Detector | other other : person 1 |
Resolutory Action | none taken : detected after the fact |
Consequence | other other |
Factors | |
Maintenance | contributing factor : engineering procedure performance deficiency : non compliance with legal requirements performance deficiency : logbook entry |
Supplementary | |
Problem Areas | Company Maintenance Human Performance Chart Or Publication |
Primary Problem | Aircraft |
Narrative:
While working on other cabin systems on aircraft xyz, I noticed wire sleeve for power port wiring abraded near right overwing exit (in seat track). I obtained MEL 25-32-xzxz from maintenance control. Upon reading this MEL afterward, my attention was brought to the activation/implementation date at the top of the page in our MEL book. The date is apr/xa/00. This placard becomes legal on that date. We are in violation of policy issuing this MEL.
Original NASA ASRS Text
Title: A B757-200 HAS A DEFERRED ITEM ENTERED ON A SEAT PWR PORT WIRING PER THE MEL, BUT LATER DISCOVERY INDICATES DATE OF ACTIVATION OF THE MEL USED IS 8 DAYS AFTER THE DEFERRAL.
Narrative: WHILE WORKING ON OTHER CABIN SYSTEMS ON ACFT XYZ, I NOTICED WIRE SLEEVE FOR PWR PORT WIRING ABRADED NEAR R OVERWING EXIT (IN SEAT TRACK). I OBTAINED MEL 25-32-XZXZ FROM MAINT CTL. UPON READING THIS MEL AFTERWARD, MY ATTN WAS BROUGHT TO THE ACTIVATION/IMPLEMENTATION DATE AT THE TOP OF THE PAGE IN OUR MEL BOOK. THE DATE IS APR/XA/00. THIS PLACARD BECOMES LEGAL ON THAT DATE. WE ARE IN VIOLATION OF POLICY ISSUING THIS MEL.
Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.