Narrative:

Inspection was inspecting area for corrosion. The upgrade lead handed us paperwork for floor beam corrosion at sta:395 rbl 12. We started to remove the aircraft structure, intercoastals at sta:395 and from sta:395 to sta:418. At about XA35 or XA45, the upgrade lead came to get the paperwork, but we were still working to get out the intercoastal at sta:395 to sta:418 rbl 12. This is what I put on turnover, but because I was hurried, I forgot to include that we disconnected some pulley brackets. The paperwork for the pulley brackets has a separate work card for reinstallation.

Google
 

Original NASA ASRS Text

Title: A B757-200, DURING A MAINT CHK, FLOOR BEAM CORROSION REPAIR WAS STARTED AND AT JOB TURNOVER, SEVERAL DISCONNECTED CABLE PULLEYS WERE NOT WRITTEN UP.

Narrative: INSPECTION WAS INSPECTING AREA FOR CORROSION. THE UPGRADE LEAD HANDED US PAPERWORK FOR FLOOR BEAM CORROSION AT STA:395 RBL 12. WE STARTED TO REMOVE THE ACFT STRUCTURE, INTERCOASTALS AT STA:395 AND FROM STA:395 TO STA:418. AT ABOUT XA35 OR XA45, THE UPGRADE LEAD CAME TO GET THE PAPERWORK, BUT WE WERE STILL WORKING TO GET OUT THE INTERCOASTAL AT STA:395 TO STA:418 RBL 12. THIS IS WHAT I PUT ON TURNOVER, BUT BECAUSE I WAS HURRIED, I FORGOT TO INCLUDE THAT WE DISCONNECTED SOME PULLEY BRACKETS. THE PAPERWORK FOR THE PULLEY BRACKETS HAS A SEPARATE WORK CARD FOR REINSTALLATION.

Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.