37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
Attributes | |
ACN | 502000 |
Time | |
Date | 200102 |
Day | Thu |
Local Time Of Day | 1801 To 2400 |
Place | |
Locale Reference | airport : las.airport |
State Reference | NV |
Altitude | agl single value : 800 |
Environment | |
Flight Conditions | VMC |
Light | Night |
Aircraft 1 | |
Controlling Facilities | tower : las.tower tower : fat.tower |
Operator | common carrier : air carrier |
Make Model Name | AS 350 Astar/Ecureuil |
Operating Under FAR Part | Part 135 |
Flight Phase | descent : intermediate altitude |
Route In Use | arrival : vfr |
Flight Plan | VFR |
Person 1 | |
Affiliation | company : air taxi |
Function | flight crew : single pilot |
Qualification | pilot : commercial |
Experience | flight time last 90 days : 150 flight time total : 1900 flight time type : 480 |
ASRS Report | 502000 |
Person 2 | |
Affiliation | government : faa |
Function | controller : local |
Qualification | controller : radar |
Events | |
Anomaly | aircraft equipment problem : less severe non adherence : far non adherence : published procedure |
Independent Detector | other flight crewa |
Resolutory Action | none taken : detected after the fact |
Consequence | other |
Supplementary | |
Problem Areas | Maintenance Human Performance Flight Crew Human Performance Aircraft |
Primary Problem | Aircraft |
Narrative:
Miscalculated time left before 100 hour inspection was due and the inspection was overflown for 1.5 hours.
Original NASA ASRS Text
Title: PLT OF A EURO COPTER A350BA OPERATED THE ACFT PAST REQUIRED 100 HR INSPECTION.
Narrative: MISCALCULATED TIME LEFT BEFORE 100 HR INSPECTION WAS DUE AND THE INSPECTION WAS OVERFLOWN FOR 1.5 HRS.
Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.