37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
Attributes | |
ACN | 516587 |
Time | |
Date | 200107 |
Day | Tue |
Local Time Of Day | 1201 To 1800 |
Place | |
Locale Reference | airport : apc.airport |
State Reference | CA |
Environment | |
Flight Conditions | Mixed |
Light | Daylight |
Aircraft 1 | |
Controlling Facilities | tracon : o90.tracon tower : apc.tower |
Operator | general aviation : personal |
Make Model Name | Skyhawk 172/Cutlass 172 |
Operating Under FAR Part | Part 91 |
Flight Phase | descent : approach ground : parked |
Flight Plan | IFR |
Person 1 | |
Affiliation | other |
Function | flight crew : single pilot |
Qualification | pilot : private |
Experience | flight time last 90 days : 55 flight time total : 525 flight time type : 425 |
ASRS Report | 516587 |
Person 2 | |
Affiliation | government : faa |
Function | controller : approach |
Events | |
Anomaly | incursion : landing without clearance other anomaly other |
Independent Detector | aircraft equipment other aircraft equipment : 1 |
Resolutory Action | none taken : unable |
Supplementary | |
Problem Areas | ATC Human Performance |
Primary Problem | ATC Human Performance |
Air Traffic Incident | Inter Facility Coordination Failure other |
Situations | |
ATC Facility | procedure or policy : o90.tracon |
Narrative:
A number of times recently (at least 5) approach has not handed us over to tower in a timely manner. For example, at napa, ca, we asked approach to hand us over 3-4 times, before and after passing the FAF. In that instance, we were 1/2 mi from the threshold before we got to tower. Approach mumbled something about not getting a clearance. This has also happened at lvk and sck.
Original NASA ASRS Text
Title: PVT PLT OF A C172 COMPLAINS ABOUT DELAYED HDOFS BY APCH CTLR TO THE TWR CAUSING DELAY IN GETTING LNDG CLRNC UNTIL ON SHORT FINAL. IT ALSO CREATES A HVY WORKLOAD FOR SINGLE PLT IFR TO BE CONCENTRATING ON FINAL INST APCH AND IN ADDITIONAL SWITCH FREQS.
Narrative: A NUMBER OF TIMES RECENTLY (AT LEAST 5) APCH HAS NOT HANDED US OVER TO TWR IN A TIMELY MANNER. FOR EXAMPLE, AT NAPA, CA, WE ASKED APCH TO HAND US OVER 3-4 TIMES, BEFORE AND AFTER PASSING THE FAF. IN THAT INSTANCE, WE WERE 1/2 MI FROM THE THRESHOLD BEFORE WE GOT TO TWR. APCH MUMBLED SOMETHING ABOUT NOT GETTING A CLRNC. THIS HAS ALSO HAPPENED AT LVK AND SCK.
Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.