Narrative:

Downsized and realigned the crews and disbanded the engine change crew on swing shift. This led to persons that do not have experience on engine changes. When I went through the paper pack, I found a log write-up on aircraft not addressed to the engine run. Paper was not done and engine installation task oriented document not signed off.

Google
 

Original NASA ASRS Text

Title: A B747-400 WAS DISPATCHED IN NON COMPLIANCE WITH ENG CHANGE JOB CARDS AND 1 LOGBOOK RPT NOT COMPLETE OR ANSWERED.

Narrative: DOWNSIZED AND REALIGNED THE CREWS AND DISBANDED THE ENG CHANGE CREW ON SWING SHIFT. THIS LED TO PERSONS THAT DO NOT HAVE EXPERIENCE ON ENG CHANGES. WHEN I WENT THROUGH THE PAPER PACK, I FOUND A LOG WRITE-UP ON ACFT NOT ADDRESSED TO THE ENG RUN. PAPER WAS NOT DONE AND ENG INSTALLATION TASK ORIENTED DOCUMENT NOT SIGNED OFF.

Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.