37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
Attributes | |
ACN | 532116 |
Time | |
Date | 200111 |
Day | Mon |
Local Time Of Day | 1201 To 1800 |
Place | |
Locale Reference | airport : zzz.airport |
State Reference | US |
Altitude | agl single value : 0 |
Aircraft 1 | |
Make Model Name | B757-200 |
Person 1 | |
Affiliation | company : air carrier |
Function | oversight : supervisor |
Qualification | technician : airframe technician : powerplant |
ASRS Report | 532116 |
Events | |
Anomaly | aircraft equipment problem : less severe maintenance problem : improper documentation non adherence : company policies non adherence : far non adherence : published procedure |
Independent Detector | other other : person 1 |
Resolutory Action | none taken : detected after the fact |
Consequence | other |
Factors | |
Maintenance | contributing factor : schedule pressure contributing factor : work cards performance deficiency : logbook entry performance deficiency : scheduled maintenance |
Supplementary | |
Problem Areas | Aircraft Maintenance Human Performance |
Primary Problem | Maintenance Human Performance |
Narrative:
On nov/mon/01 a missing seal was reported on the acm inlet both right and left sides on write-up. The items were deferred per manual. After talking to technician, technician said a deferral item would be issued after the deferral was on release. Once the work package was turned in, one of the write-ups was not processed to release. On nov/tue/01 I reviewed the release to verify both write-ups and deferred item was present on aircraft and found one missing. Called technician and had items added correctly.
Original NASA ASRS Text
Title: A B757-200 WAS DISPATCHED IN NON COMPLIANCE WITH 2 INLET AIR CYCLE MACHINE SEALS MISSING AND DEFERRED BUT ONLY ONE LISTED ON THE MAINT RELEASE.
Narrative: ON NOV/MON/01 A MISSING SEAL WAS RPTED ON THE ACM INLET BOTH R AND L SIDES ON WRITE-UP. THE ITEMS WERE DEFERRED PER MANUAL. AFTER TALKING TO TECHNICIAN, TECHNICIAN SAID A DEFERRAL ITEM WOULD BE ISSUED AFTER THE DEFERRAL WAS ON RELEASE. ONCE THE WORK PACKAGE WAS TURNED IN, ONE OF THE WRITE-UPS WAS NOT PROCESSED TO RELEASE. ON NOV/TUE/01 I REVIEWED THE RELEASE TO VERIFY BOTH WRITE-UPS AND DEFERRED ITEM WAS PRESENT ON ACFT AND FOUND ONE MISSING. CALLED TECHNICIAN AND HAD ITEMS ADDED CORRECTLY.
Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.