Narrative:

Removed and installed elevator pressure control valve. Being aware of time given to fix aircraft ship X having a departure time of XA15 and having to repos aircraft from the line to the hangar, put aircraft into tail dock. Then when done, take aircraft back to line, time was of the essence. What really caused the problem of forgetting to get part and installation rii was pressure of having aircraft ready for departure and working too fast.

Google
 

Original NASA ASRS Text

Title: AN MD88 WAS DISPATCHED IN NON COMPLIANCE WITH AN ELEVATOR PRESSURE CTL VALVE HAVING BEEN REPLACED BUT NOT HAVING THE FAA REQUIRED INSPECTION.

Narrative: REMOVED AND INSTALLED ELEVATOR PRESSURE CTL VALVE. BEING AWARE OF TIME GIVEN TO FIX ACFT SHIP X HAVING A DEP TIME OF XA15 AND HAVING TO REPOS ACFT FROM THE LINE TO THE HANGAR, PUT ACFT INTO TAIL DOCK. THEN WHEN DONE, TAKE ACFT BACK TO LINE, TIME WAS OF THE ESSENCE. WHAT REALLY CAUSED THE PROB OF FORGETTING TO GET PART AND INSTALLATION RII WAS PRESSURE OF HAVING ACFT READY FOR DEP AND WORKING TOO FAST.

Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.