37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
Attributes | |
ACN | 581699 |
Time | |
Date | 200304 |
Day | Sun |
Local Time Of Day | 0601 To 1200 |
Place | |
Locale Reference | atc facility : zid.artcc |
State Reference | IN |
Altitude | msl single value : 23300 |
Environment | |
Flight Conditions | VMC |
Light | Daylight |
Aircraft 1 | |
Controlling Facilities | artcc : zid.artcc |
Operator | common carrier : air carrier |
Make Model Name | Regional Jet CL65, Undifferentiated or Other Model |
Operating Under FAR Part | Part 121 |
Flight Phase | climbout : vacating altitude climbout : intermediate altitude cruise : enroute altitude change |
Flight Plan | IFR |
Person 1 | |
Affiliation | company : air carrier |
Function | flight crew : first officer |
Qualification | pilot : atp |
Experience | flight time last 90 days : 180 flight time total : 3500 flight time type : 625 |
ASRS Report | 581699 |
Person 2 | |
Affiliation | company : air carrier |
Function | flight crew : captain oversight : pic |
Events | |
Anomaly | non adherence : far non adherence : clearance non adherence : company policies other spatial deviation |
Independent Detector | other controllera |
Resolutory Action | controller : issued new clearance flight crew : returned to intended or assigned course |
Supplementary | |
Problem Areas | ATC Human Performance Flight Crew Human Performance |
Primary Problem | Ambiguous |
Narrative:
While on an assigned heading, we were cleared to climb to FL270, passing FL230 direct etg, which I read back. Passing FL230, we initiated the turn (left) direct. At FL234 the controller asked if we started an early turn. I stated we started the turn at FL230 as directed. He told us he had cleared us direct through FL240 vice FL230 and gave us a turn back to the right (approximately 20 degrees). As we rolled out on the new heading we were reclred direct etg and handed off to the next sector. Both the captain and I heard the original clearance as 'climb and maintain FL270, leaving FL230, cleared direct etg.'
Original NASA ASRS Text
Title: A CL65 FO RPTED A READBACK ERROR WITH ZID WHICH CAUSED A TRACK DEV.
Narrative: WHILE ON AN ASSIGNED HEADING, WE WERE CLRED TO CLB TO FL270, PASSING FL230 DIRECT ETG, WHICH I READ BACK. PASSING FL230, WE INITIATED THE TURN (L) DIRECT. AT FL234 THE CTLR ASKED IF WE STARTED AN EARLY TURN. I STATED WE STARTED THE TURN AT FL230 AS DIRECTED. HE TOLD US HE HAD CLRED US DIRECT THROUGH FL240 VICE FL230 AND GAVE US A TURN BACK TO THE R (APPROX 20 DEGS). AS WE ROLLED OUT ON THE NEW HEADING WE WERE RECLRED DIRECT ETG AND HANDED OFF TO THE NEXT SECTOR. BOTH THE CAPT AND I HEARD THE ORIGINAL CLRNC AS 'CLB AND MAINTAIN FL270, LEAVING FL230, CLRED DIRECT ETG.'
Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.