Narrative:

Departing runway 24 on the teb 5 departure. We climbed through 1500 ft before reaching 4.5 teb VOR DME fix. When excursion detected aircraft climbed more than (300 ft) 1800 ft MSL before corrective action. Controller advised of altitude and suggest we review carefully the altitude requirements of the departure. No other aircraft involved. Corrective recommendation: better crew coordination and verification of altitude pre-select and autoplt capture modes.

Google
 

Original NASA ASRS Text

Title: FLT CREW OF C560 DEVIATES FROM THE 1500 FT MSL INITIAL CLB RESTR ON THE TEB DEP. ADVISED BY DEP CTLR TO RETURN AND COMPLY.

Narrative: DEPARTING RWY 24 ON THE TEB 5 DEP. WE CLBED THROUGH 1500 FT BEFORE REACHING 4.5 TEB VOR DME FIX. WHEN EXCURSION DETECTED ACFT CLBED MORE THAN (300 FT) 1800 FT MSL BEFORE CORRECTIVE ACTION. CTLR ADVISED OF ALT AND SUGGEST WE REVIEW CAREFULLY THE ALT REQUIREMENTS OF THE DEP. NO OTHER ACFT INVOLVED. CORRECTIVE RECOMMENDATION: BETTER CREW COORD AND VERIFICATION OF ALT PRE-SELECT AND AUTOPLT CAPTURE MODES.

Data retrieved from NASA's ASRS site as of January 2009 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.