37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
Attributes | |
ACN | 672351 |
Time | |
Date | 200509 |
Local Time Of Day | 0001 To 0600 |
Place | |
Locale Reference | airport : zzz.airport |
State Reference | US |
Altitude | agl single value : 0 |
Environment | |
Light | Dawn |
Aircraft 1 | |
Operator | common carrier : air carrier |
Make Model Name | B737-300 |
Operating Under FAR Part | Part 121 |
Flight Phase | ground : maintenance |
Person 1 | |
Affiliation | company : air carrier |
Function | maintenance : inspector |
Qualification | technician : inspection authority |
ASRS Report | 672351 |
Person 2 | |
Affiliation | company : air carrier |
Function | maintenance : technician |
ASRS Report | 672526 |
Events | |
Anomaly | aircraft equipment problem : critical maintenance problem : improper maintenance maintenance problem : improper documentation non adherence : far non adherence : published procedure |
Independent Detector | other other : 1 |
Resolutory Action | none taken : detected after the fact |
Factors | |
Maintenance | performance deficiency : inspection performance deficiency : installation |
Supplementary | |
Problem Areas | Aircraft Chart Or Publication Maintenance Human Performance |
Primary Problem | Maintenance Human Performance |
Narrative:
On sep/tue/05 I was notified that aircraft had a pylon panel #5829 detach in-flight. The aircraft was in for 'C' check on sep/mon/05; at which time the panel was removed and installed. I bought off the panel installation on the routine paperwork package. At the time of installation; I witnessed the lock position indicators in the proper orientation; and bought off the panel installation.
Original NASA ASRS Text
Title: A B737-300 WAS RELEASED AND RETURNED TO SVC FROM A 'C' CHK. FIRST FLT A PYLON ACCESS PANEL DEPARTED THE ACFT.
Narrative: ON SEP/TUE/05 I WAS NOTIFIED THAT ACFT HAD A PYLON PANEL #5829 DETACH INFLT. THE ACFT WAS IN FOR 'C' CHK ON SEP/MON/05; AT WHICH TIME THE PANEL WAS REMOVED AND INSTALLED. I BOUGHT OFF THE PANEL INSTALLATION ON THE ROUTINE PAPERWORK PACKAGE. AT THE TIME OF INSTALLATION; I WITNESSED THE LOCK POS INDICATORS IN THE PROPER ORIENTATION; AND BOUGHT OFF THE PANEL INSTALLATION.
Data retrieved from NASA's ASRS site as of January 2009 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.