Narrative:

Upon returning to ZZZ1 from ZZZ2; we were to contact maintenance control. They wanted to know what deferrals were shown for the APU. I gave maintenance the following from the maintenance log -- deferred maintenance item section. APU door MEL 49-14-01-0; dated mar/sat. APU xflow pump MEL 28-24-01-12; dated mar/sun. And; finally; APU MEL 40-10-01 paragraph 1; dated mar/sun. Maintenance said that the APU xflow pump and APU deferral were in conflict with one another and the aircraft shouldn't have flown. The aircraft flew 3 flts on mar/sat and 3 flts before we picked up the aircraft on mar/sun and went to ZZZ2 and back. I saw the deferrals as a progressive problem with the APU system with the final complete deferral of the unit as superseding the previous deferrals.

Google
 

Original NASA ASRS Text

Title: A CRJ200 WAS OPERATED FOR SEVERAL DAYS WITH DEFERRED MAINT ITEMS ON THE APU THAT WERE IN CONFLICT WITH THE MEL.

Narrative: UPON RETURNING TO ZZZ1 FROM ZZZ2; WE WERE TO CONTACT MAINT CTL. THEY WANTED TO KNOW WHAT DEFERRALS WERE SHOWN FOR THE APU. I GAVE MAINT THE FOLLOWING FROM THE MAINT LOG -- DEFERRED MAINT ITEM SECTION. APU DOOR MEL 49-14-01-0; DATED MAR/SAT. APU XFLOW PUMP MEL 28-24-01-12; DATED MAR/SUN. AND; FINALLY; APU MEL 40-10-01 PARAGRAPH 1; DATED MAR/SUN. MAINT SAID THAT THE APU XFLOW PUMP AND APU DEFERRAL WERE IN CONFLICT WITH ONE ANOTHER AND THE ACFT SHOULDN'T HAVE FLOWN. THE ACFT FLEW 3 FLTS ON MAR/SAT AND 3 FLTS BEFORE WE PICKED UP THE ACFT ON MAR/SUN AND WENT TO ZZZ2 AND BACK. I SAW THE DEFERRALS AS A PROGRESSIVE PROB WITH THE APU SYS WITH THE FINAL COMPLETE DEFERRAL OF THE UNIT AS SUPERSEDING THE PREVIOUS DEFERRALS.

Data retrieved from NASA's ASRS site as of January 2009 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.