Narrative:

Since I arrived in this shop it was considered shop practice to 'nr' [not required] the shot-peen dovetail repair; when required on 8TH stage narrow compressor stator vanes. I have come to find out this is not correct. Engineering service order 72-32-04 repair 2 calls for the shot-peen process to be accomplished. We are currently holding these vanes in our shop and are currently talking to engineering.

Google
 

Original NASA ASRS Text

Title: AN ENG SHOP TECHNICIAN RPTS THE SHOT-PEENING DOVETAIL REPAIR ON THE 8TH STAGE STATOR VANE WAS NEVER REQUIRED. RECENTLY DISCOVERED ENGINEERING SVC ORDER REQUIRING SHOT-PEENING. VANES HELD IN QUARANTINE.

Narrative: SINCE I ARRIVED IN THIS SHOP IT WAS CONSIDERED SHOP PRACTICE TO 'NR' [NOT REQUIRED] THE SHOT-PEEN DOVETAIL REPAIR; WHEN REQUIRED ON 8TH STAGE NARROW COMPRESSOR STATOR VANES. I HAVE COME TO FIND OUT THIS IS NOT CORRECT. ENGINEERING SVC ORDER 72-32-04 REPAIR 2 CALLS FOR THE SHOT-PEEN PROCESS TO BE ACCOMPLISHED. WE ARE CURRENTLY HOLDING THESE VANES IN OUR SHOP AND ARE CURRENTLY TALKING TO ENGINEERING.

Data retrieved from NASA's ASRS site as of January 2009 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.