37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
Attributes | |
ACN | 701156 |
Time | |
Date | 200606 |
Local Time Of Day | 1201 To 1800 |
Place | |
Locale Reference | airport : teb.airport |
State Reference | NJ |
Altitude | msl bound lower : 1500 msl bound upper : 1800 |
Environment | |
Flight Conditions | VMC |
Light | Daylight |
Aircraft 1 | |
Controlling Facilities | tracon : n90.tracon |
Operator | general aviation : corporate |
Make Model Name | Gulfstream IV |
Operating Under FAR Part | Part 91 |
Navigation In Use | other other vortac |
Flight Phase | climbout : initial |
Route In Use | departure sid : teb 5 |
Flight Plan | IFR |
Person 1 | |
Affiliation | company : corporate |
Function | flight crew : captain oversight : pic |
Qualification | pilot : atp |
Experience | flight time last 90 days : 120 flight time total : 19000 flight time type : 10000 |
ASRS Report | 701156 |
Person 2 | |
Affiliation | government : faa |
Function | controller : local |
Events | |
Anomaly | altitude deviation : overshoot non adherence : published procedure non adherence : clearance |
Independent Detector | other controllera |
Resolutory Action | controller : issued advisory |
Supplementary | |
Problem Areas | Flight Crew Human Performance |
Primary Problem | Flight Crew Human Performance |
Narrative:
Departed runway 24 at teb on the teb 5 departure. Climbing to 2000 ft with restr to maintain 1500 ft until 4.5 DME teb VOR. Prior to the 4.5 DME I leveled at 1800 ft. Controller noticed the overshoot and gave us a continue climb. No interference with other traffic for ewr. I've done this departure many times but this time we used maximum thrust setting for takeoff due to wet runway. I was distraction with the HUD starting to strobe and allowed my attention to be diverted from flying the airplane. To avoid this situation I need to make sure I always fly the airplane first.
Original NASA ASRS Text
Title: GIV FLT CREW HAS AN ALT OVERSHOOT DURING THE TEB 5 RWY 24 DEP.
Narrative: DEPARTED RWY 24 AT TEB ON THE TEB 5 DEP. CLBING TO 2000 FT WITH RESTR TO MAINTAIN 1500 FT UNTIL 4.5 DME TEB VOR. PRIOR TO THE 4.5 DME I LEVELED AT 1800 FT. CTLR NOTICED THE OVERSHOOT AND GAVE US A CONTINUE CLB. NO INTERFERENCE WITH OTHER TFC FOR EWR. I'VE DONE THIS DEP MANY TIMES BUT THIS TIME WE USED MAX THRUST SETTING FOR TAKEOFF DUE TO WET RWY. I WAS DISTR WITH THE HUD STARTING TO STROBE AND ALLOWED MY ATTENTION TO BE DIVERTED FROM FLYING THE AIRPLANE. TO AVOID THIS SITUATION I NEED TO MAKE SURE I ALWAYS FLY THE AIRPLANE FIRST.
Data retrieved from NASA's ASRS site as of January 2009 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.