Narrative:

Aircraft scheduled for ron (routine overnight check) workload which included borescope inspection of #1 engine combustion chamber and hpt (high pressure turbine). Work card instructs technician to remove all access plugs around combustion chamber (9 each) although not all are required to complete the task. 12 O'clock position is not usually removed and was overlooked. Missing plug was discovered when inducted into heavy check on oct/thu/06.

Google
 

Original NASA ASRS Text

Title: A B757-200 L ENG HAD THE COMBUSTION CHAMBER BORESCOPED AND ENG BORESCOPE ACCESS PLUG AT 12 O'CLOCK POS WAS REMOVED AND NOT REINSTALLED.

Narrative: ACFT SCHEDULED FOR RON (ROUTINE OVERNIGHT CHK) WORKLOAD WHICH INCLUDED BORESCOPE INSPECTION OF #1 ENG COMBUSTION CHAMBER AND HPT (HIGH PRESSURE TURBINE). WORK CARD INSTRUCTS TECHNICIAN TO REMOVE ALL ACCESS PLUGS AROUND COMBUSTION CHAMBER (9 EACH) ALTHOUGH NOT ALL ARE REQUIRED TO COMPLETE THE TASK. 12 O'CLOCK POS IS NOT USUALLY REMOVED AND WAS OVERLOOKED. MISSING PLUG WAS DISCOVERED WHEN INDUCTED INTO HVY CHK ON OCT/THU/06.

Data retrieved from NASA's ASRS site as of January 2009 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.