37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
Attributes | |
ACN | 722381 |
Time | |
Date | 200611 |
Place | |
Locale Reference | airport : den.airport |
State Reference | CO |
Altitude | agl single value : 0 |
Environment | |
Flight Conditions | VMC |
Light | Night |
Aircraft 1 | |
Controlling Facilities | tower : dkx.tower |
Operator | general aviation : personal |
Make Model Name | PA-30 Twin Comanche |
Operating Under FAR Part | Part 91 |
Flight Phase | landing : roll |
Flight Plan | VFR |
Person 1 | |
Affiliation | other |
Function | flight crew : single pilot |
Qualification | pilot : cfi pilot : multi engine pilot : atp |
Experience | flight time last 90 days : 50 flight time total : 30000 flight time type : 300 |
ASRS Report | 722381 |
Events | |
Anomaly | aircraft equipment problem : critical ground encounters : gear up landing |
Independent Detector | other flight crewa |
Resolutory Action | none taken : unable |
Consequence | other |
Supplementary | |
Problem Areas | Aircraft |
Primary Problem | Aircraft |
Narrative:
During rollout after landing; at taxi speed; left gear collapsed followed by right gear and nosewheel. Gear handle in down and locked position; gear light green and all checklists completed. No fire.
Original NASA ASRS Text
Title: DESPITE GEAR HANDLE IN DOWN POS AND GREEN LIGHTS; ALL 3 GEAR COLLAPSE ON PA30 DURING LNDG ROLLOUT.
Narrative: DURING ROLLOUT AFTER LNDG; AT TAXI SPD; L GEAR COLLAPSED FOLLOWED BY R GEAR AND NOSEWHEEL. GEAR HANDLE IN DOWN AND LOCKED POS; GEAR LIGHT GREEN AND ALL CHKLISTS COMPLETED. NO FIRE.
Data retrieved from NASA's ASRS site as of January 2009 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.