Narrative:

I was told to perform a new torqueing procedure on a propeller without an updated maintenance revision in the engine shop. Mr X; mr Y; and mr Z were present during the set-up of this procedure. I had called the manufacturer field representative for information; and he strongly recommended that this procedure not be carried out until the proper tooling became available. I feel company is trying to complete this procedure too soon without the proper tooling and without an updated maintenance manual. I was extremely pressured before the current revision was provided.

Google
 

Original NASA ASRS Text

Title: MECHANIC REPORTS ON BEING EXTREMELY PRESSURED BY HIS CARRIER TO PERFORM A NEW TORQUEING PROCEDURE ON A PROPELLER IN THE ENGINE SHOP; WITHOUT AN UPDATED MAINT REVISION.

Narrative: I WAS TOLD TO PERFORM A NEW TORQUEING PROC ON A PROP WITHOUT AN UPDATED MAINT REVISION IN THE ENG SHOP. MR X; MR Y; AND MR Z WERE PRESENT DURING THE SET-UP OF THIS PROC. I HAD CALLED THE MANUFACTURER FIELD REPRESENTATIVE FOR INFO; AND HE STRONGLY RECOMMENDED THAT THIS PROC NOT BE CARRIED OUT UNTIL THE PROPER TOOLING BECAME AVAILABLE. I FEEL COMPANY IS TRYING TO COMPLETE THIS PROC TOO SOON WITHOUT THE PROPER TOOLING AND WITHOUT AN UPDATED MAINT MANUAL. I WAS EXTREMELY PRESSURED BEFORE THE CURRENT REVISION WAS PROVIDED.

Data retrieved from NASA's ASRS site as of May 2009 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.