Narrative:

Hangar aircraft was in for both left and right gear time change. During clearance check of shock strut roller and primary cam; the clearance was adjusted to the wrong dimension at 0.016 inches. The clearance required is 0.14 + 0.03 inches as per the saab 340 amm 32-11-05-04 step 19. Regional manager was notified who then notified maintenance control who notified ZZZ to have aircraft looked at and repaired. Misinterped published dimension information. Slow down and interpretation published dimensions correctly.

Google
 

Original NASA ASRS Text

Title: A MAINT INSPECTOR MISINTERPRETED THE CLEARANCE GAP CHECK OF A SAAB 340-B; LEFT AND RIGHT LANDING GEAR SHOCK STRUT ROLLER AND PRIMARY CAM ASSEMBLY. THE CLEARANCE WAS ADJUSTED TO THE WRONG DIMENSION.

Narrative: HANGAR ACFT WAS IN FOR BOTH L AND R GEAR TIME CHANGE. DURING CLRNC CHK OF SHOCK STRUT ROLLER AND PRIMARY CAM; THE CLRNC WAS ADJUSTED TO THE WRONG DIMENSION AT 0.016 INCHES. THE CLRNC REQUIRED IS 0.14 + 0.03 INCHES AS PER THE SAAB 340 AMM 32-11-05-04 STEP 19. REGIONAL MGR WAS NOTIFIED WHO THEN NOTIFIED MAINT CTL WHO NOTIFIED ZZZ TO HAVE ACFT LOOKED AT AND REPAIRED. MISINTERPED PUBLISHED DIMENSION INFO. SLOW DOWN AND INTERP PUBLISHED DIMENSIONS CORRECTLY.

Data retrieved from NASA's ASRS site as of May 2009 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.