Narrative:

P80 approach could not hand off air carrier X to sector 06 through automation. Used the flight plan entry for air carrier X and found 2 flight plans; one active; one not. Used the /ok feature to grab air carrier X with the cid and it showed 'unknown' as it was overdue by close to 24 hours. Removed strips (rs) and departed air carrier X; different cid ; changed the code and had air carrier X 'ident' to confirm radar contact. The flight plan with the old cid was left over from the previous day. This can cause mis-identification; confusion and possible errors. Absolutely unacceptable from eram (en route automation modernization). Recommendation; stop eram testing on live traffic until all critical's are fixed.

Google
 

Original NASA ASRS Text

Title: ZSE Controller described confused hand off event from P80 when ERAM had two flight plans stored; one from the previous day; the automated data not matching; reporter suggesting ERAM testing be halted until ERAM is fixed.

Narrative: P80 Approach could not hand off Air Carrier X to Sector 06 through automation. Used the flight plan entry for Air Carrier X and found 2 flight plans; one active; one not. Used the /ok feature to grab Air Carrier X with the CID and it showed 'Unknown' as it was overdue by close to 24 hours. Removed strips (RS) and departed Air Carrier X; different CID ; changed the code and had Air Carrier X 'ident' to confirm RADAR contact. The flight plan with the OLD CID was left over from the previous day. This can cause mis-identification; confusion and possible errors. Absolutely unacceptable from ERAM (En Route Automation Modernization). Recommendation; stop ERAM testing on live traffic until all critical's are fixed.

Data retrieved from NASA's ASRS site as of April 2012 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.