Narrative:

Cleared for ILS 5R from smo. Speed 200 KT assigned; gear down; checklist complete. Passing smo descended on profile; speed 180 KT assigned then assigned 160 KT. Flaps 3 selected. At lead radial managed speed requested; flaps full selected and approach armed. Descending from 8;800; glide slope captured first. Upon localizer capture aircraft banked; pitched up and was followed by a 'speed' call. Auto thrust and autopilot were immediately disconnected and approach was completed manually. Runway 5R was in sight and eventually we sidestepped to 5L for uneventful landing.

Google
 

Original NASA ASRS Text

Title: A319 Captain experiences a pitch up as the glide slope is captured during the ILS 5R approach to MMMX. Autopilot and autothrust are disconnected and approach is completed manually.

Narrative: Cleared for ILS 5R from SMO. Speed 200 KT assigned; gear down; checklist complete. Passing SMO descended on profile; speed 180 KT assigned then assigned 160 KT. Flaps 3 selected. At lead radial managed speed requested; flaps full selected and approach armed. Descending from 8;800; glide slope captured first. Upon localizer capture aircraft banked; pitched up and was followed by a 'SPEED' call. Auto thrust and autopilot were immediately disconnected and approach was completed manually. Runway 5R was in sight and eventually we sidestepped to 5L for uneventful landing.

Data retrieved from NASA's ASRS site as of April 2012 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.