Narrative:

I was assigned to install the aileron system cables [during] a [C-check]. I installed both left and right-hand aileron system cables; and to the best of my knowledge; routed the cables properly in accordance with the maintenance manual (M/M). An inspector checked the installation of the cables and signed-off on them. I was notified [approximately two weeks later] that a right-hand aileron cable broke on the ground in ZZZ1.

Google
 

Original NASA ASRS Text

Title: Approximately two weeks after installing the left and right-hand aileron system cables on a EMB-145 aircraft during a C-Check; three mechanics and one Inspector were notified the right-hand aileron cable was found broken; while the aircraft was on the ground in ZZZ1.

Narrative: I was assigned to install the aileron system cables [during] a [C-Check]. I installed both left and right-hand aileron system cables; and to the best of my knowledge; routed the cables properly in accordance with the Maintenance Manual (M/M). An Inspector checked the installation of the cables and signed-off on them. I was notified [approximately two weeks later] that a right-hand aileron cable broke on the ground in ZZZ1.

Data retrieved from NASA's ASRS site as of April 2012 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.