Narrative:

Had extension on maintenance inspection thru 10/xx/89. When we landed at +30 local (on 10/xy/89 zulu) maintenance control said we were illegal. However we had been flight planned to arrive right at +00 but met with ATC delays on our 4 hour 16 min (planned) flight that stretched it by 20 mins flight (30 min block).

Google
 

Original NASA ASRS Text

Title: FLT CREW OPERATES ACFT BEYOND ALREADY EXTENDED MAINTENANCE INSPECTION REQUIREMENT.

Narrative: HAD EXTENSION ON MAINT INSPECTION THRU 10/XX/89. WHEN WE LANDED AT +30 LOCAL (ON 10/XY/89 ZULU) MAINT CTL SAID WE WERE ILLEGAL. HOWEVER WE HAD BEEN FLT PLANNED TO ARRIVE RIGHT AT +00 BUT MET WITH ATC DELAYS ON OUR 4 HR 16 MIN (PLANNED) FLT THAT STRETCHED IT BY 20 MINS FLT (30 MIN BLOCK).

Data retrieved from NASA's ASRS site as of August 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.