Narrative:

I was assigned a structure repair I have never done before and in an area I have never worked. I laid out the repair and asked the crew chief if that looked about right he said yes. I continued on with installing fastener holes using a drill stop until the repair was ready to install. I got clearance to install and installed the doubler. I came into work the next day to find out I had inadvertently drilled into the frame behind the doubler.

Google
 

Original NASA ASRS Text

Title: On an MD83; when making a structure repair; the repair person inadvertently drilled into the frame behind the doubler.

Narrative: I was assigned a structure repair I have never done before and in an area I have never worked. I laid out the repair and asked the crew chief if that looked about right he said yes. I continued on with installing fastener holes using a drill stop until the repair was ready to install. I got clearance to install and installed the doubler. I came into work the next day to find out I had inadvertently drilled into the frame behind the doubler.

Data retrieved from NASA's ASRS site and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.