37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
Attributes | |
ACN | 155865 |
Time | |
Date | 199008 |
Day | Wed |
Local Time Of Day | 1201 To 1800 |
Place | |
Locale Reference | airport : wi14 |
State Reference | WI |
Altitude | agl bound lower : 0 agl bound upper : 0 |
Environment | |
Flight Conditions | VMC |
Light | Daylight |
Aircraft 1 | |
Operator | common carrier : air taxi |
Make Model Name | Small Aircraft, High Wing, 1 Eng, Fixed Gear |
Flight Phase | ground : preflight ground : parked other |
Flight Plan | VFR |
Person 1 | |
Affiliation | company : air taxi |
Function | flight crew : single pilot |
Qualification | pilot : commercial pilot : instrument |
Experience | flight time last 90 days : 38 flight time total : 683 flight time type : 105 |
ASRS Report | 155865 |
Person 2 | |
Affiliation | Other |
Function | other personnel other |
Qualification | other other : other |
Events | |
Anomaly | non adherence : far |
Independent Detector | other other : unspecified |
Resolutory Action | none taken : detected after the fact |
Consequence | faa : assigned or threatened penalties |
Supplementary | |
Primary Problem | Flight Crew Human Performance |
Air Traffic Incident | Pilot Deviation |
Narrative:
Upon an FAA ramp inspection, the packing card in my parachute was out of date. Inside the bldg at the parachute center where we keep parachutes, there is a calendar of all the parachuters and packing dates. The calendar said, and was marked off as being packed less than 30 days before the ramp check. The parachute was packed within the FAA regulations, but inspector would not look at calendar with our packing dates. All of my documents were in order (pilot certificate, log books, annuals, etc). I feel the parachute packer forgot to update the pack card, but he did mark off that wall calendar (as being packed) all of our pilot reserve rigs.
Original NASA ASRS Text
Title: PARACHUTE RIGGER NEGLECTS TO UPDATE PARACHUTE PACK DATE UPDATE CARDS. OMISSION DISCOVERED IN FAA RAMP CHECK.
Narrative: UPON AN FAA RAMP INSPECTION, THE PACKING CARD IN MY PARACHUTE WAS OUT OF DATE. INSIDE THE BLDG AT THE PARACHUTE CENTER WHERE WE KEEP PARACHUTES, THERE IS A CALENDAR OF ALL THE PARACHUTERS AND PACKING DATES. THE CALENDAR SAID, AND WAS MARKED OFF AS BEING PACKED LESS THAN 30 DAYS BEFORE THE RAMP CHK. THE PARACHUTE WAS PACKED WITHIN THE FAA REGS, BUT INSPECTOR WOULD NOT LOOK AT CALENDAR WITH OUR PACKING DATES. ALL OF MY DOCUMENTS WERE IN ORDER (PLT CERTIFICATE, LOG BOOKS, ANNUALS, ETC). I FEEL THE PARACHUTE PACKER FORGOT TO UPDATE THE PACK CARD, BUT HE DID MARK OFF THAT WALL CALENDAR (AS BEING PACKED) ALL OF OUR PLT RESERVE RIGS.
Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.