37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
Attributes | |
ACN | 1679435 |
Time | |
Date | 201908 |
Local Time Of Day | 1801-2400 |
Place | |
Locale Reference | HPN.Airport |
State Reference | NY |
Environment | |
Flight Conditions | IMC |
Light | Daylight |
Aircraft 1 | |
Make Model Name | Learjet 60 |
Operating Under FAR Part | Part 91 |
Flight Phase | Initial Climb |
Route In Use | Vectors |
Flight Plan | IFR |
Component | |
Aircraft Component | Pressurization System |
Person 1 | |
Function | Pilot Flying |
Qualification | Flight Crew Multiengine Flight Crew Instrument Flight Crew Flight Instructor Flight Crew Air Transport Pilot (ATP) |
Experience | Flight Crew Last 90 Days 65 Flight Crew Total 10455 Flight Crew Type 178 |
Events | |
Anomaly | Aircraft Equipment Problem Critical Deviation - Procedural Published Material / Policy |
Narrative:
Run-up/taxi checks were normal. Departed with panel clear - normal. At 6300 ft. With heard a loud bang in the back of the cabin. I immediately leveled off and pulled the power back to 200 kts. We noticed the emergency press (red master caution) light was illuminated. We descended to 6000 ft. And told ATC we were [requesting priority handling] and diverting to hpn. ATC provided new routing. My second in command ran the emergency pressurization checklist. Isolated the emergency as per the emergency press checklist. From this point the flight was conducted normally (panel clear) with a successful landing at hpn ILS runway 16 to a full stop.
Original NASA ASRS Text
Title: Learjet 60 pilot reported a loud bang followed by a priority landing.
Narrative: Run-up/taxi checks were normal. Departed with panel clear - normal. At 6300 ft. with heard a loud bang in the back of the cabin. I immediately leveled off and pulled the power back to 200 kts. We noticed the Emergency Press (red master caution) light was illuminated. We descended to 6000 ft. and told ATC we were [requesting priority handling] and diverting to HPN. ATC provided new routing. My Second in Command ran the Emergency Pressurization checklist. Isolated the emergency as per the Emergency Press checklist. From this point the flight was conducted normally (panel clear) with a successful landing at HPN ILS Runway 16 to a full stop.
Data retrieved from NASA's ASRS site and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.