37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
Attributes | |
ACN | 170619 |
Time | |
Date | 199102 |
Day | Sat |
Local Time Of Day | 0601 To 1200 |
Place | |
Locale Reference | atc facility : crl airport : dtw |
State Reference | MI |
Altitude | msl bound lower : 10500 msl bound upper : 11000 |
Environment | |
Flight Conditions | VMC |
Light | Daylight |
Aircraft 1 | |
Controlling Facilities | tower : gmu |
Operator | common carrier : air carrier |
Make Model Name | Large Transport, Low Wing, 3 Turbojet Eng |
Flight Phase | cruise other descent other |
Route In Use | enroute airway : dtw |
Flight Plan | IFR |
Person 1 | |
Affiliation | company : air carrier |
Function | flight crew : first officer |
Qualification | pilot : atp pilot : commercial pilot : instrument |
Experience | flight time last 90 days : 130 flight time total : 6500 flight time type : 1300 |
ASRS Report | 170619 |
Person 2 | |
Affiliation | company : air carrier |
Function | flight crew : captain oversight : pic |
Qualification | pilot : atp |
Events | |
Anomaly | altitude deviation : overshoot non adherence : clearance |
Independent Detector | other flight crewa |
Resolutory Action | flight crew : returned to intended course or assigned course |
Consequence | Other |
Supplementary | |
Primary Problem | Flight Crew Human Performance |
Air Traffic Incident | Pilot Deviation |
Narrative:
Descent into dtw. Captain and I both had not flown for a period of time. I had not flown since TCAS implementation. With descent clearance to 11000', captain and I began discussion of TCAS operation since there was some traffic, non conflict, showing. At approximately 10500' we noticed altitude deviation and immediately corrected to 11000'. There were no traffic conflicts known or reported. The biggest problem from my viewpoint is that my training in TCAS had been self-study at a computer terminal in late summer. While I felt the training itself was very good, it was 4 or 5 months ago with no follow-up, further use or recurrent of any sort. This flight was my first with actual TCAS operation. I think each carrier, since self-study programs such as this one seem to be today's method of training, should provide training carrels and programs/materials at each pilot domicile to permit self-study. 4-6 months between training and use/implementation is unacceptable.
Original NASA ASRS Text
Title: ALT OVERSHOT WHILE CREW DISTRACTED DISCUSSING TCAS II.
Narrative: DSNT INTO DTW. CAPT AND I BOTH HAD NOT FLOWN FOR A PERIOD OF TIME. I HAD NOT FLOWN SINCE TCAS IMPLEMENTATION. WITH DSNT CLRNC TO 11000', CAPT AND I BEGAN DISCUSSION OF TCAS OPERATION SINCE THERE WAS SOME TFC, NON CONFLICT, SHOWING. AT APPROX 10500' WE NOTICED ALT DEVIATION AND IMMEDIATELY CORRECTED TO 11000'. THERE WERE NO TFC CONFLICTS KNOWN OR RPTED. THE BIGGEST PROB FROM MY VIEWPOINT IS THAT MY TRNING IN TCAS HAD BEEN SELF-STUDY AT A COMPUTER TERMINAL IN LATE SUMMER. WHILE I FELT THE TRNING ITSELF WAS VERY GOOD, IT WAS 4 OR 5 MONTHS AGO WITH NO FOLLOW-UP, FURTHER USE OR RECURRENT OF ANY SORT. THIS FLT WAS MY FIRST WITH ACTUAL TCAS OPERATION. I THINK EACH CARRIER, SINCE SELF-STUDY PROGRAMS SUCH AS THIS ONE SEEM TO BE TODAY'S METHOD OF TRNING, SHOULD PROVIDE TRNING CARRELS AND PROGRAMS/MATERIALS AT EACH PLT DOMICILE TO PERMIT SELF-STUDY. 4-6 MONTHS BTWN TRNING AND USE/IMPLEMENTATION IS UNACCEPTABLE.
Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.