Narrative:

For a period of 1 week V12 from bible grove VOR to shelbyville VOR, the changeover point on the airway, was not reliable. Weak signals, especially from shelbyville VOR. I reported the problem to center after they asked me if I was on course. Solution: check vors after pilot report unreliable signals.

Google
 

Original NASA ASRS Text

Title: RPTR IN SMA ACFT EXPERIENCED WEAK SIGNAL FROM SHB VOR.

Narrative: FOR A PERIOD OF 1 WK V12 FROM BIBLE GROVE VOR TO SHELBYVILLE VOR, THE CHANGEOVER POINT ON THE AIRWAY, WAS NOT RELIABLE. WEAK SIGNALS, ESPECIALLY FROM SHELBYVILLE VOR. I RPTED THE PROBLEM TO CENTER AFTER THEY ASKED ME IF I WAS ON COURSE. SOLUTION: CHK VORS AFTER PLT RPT UNRELIABLE SIGNALS.

Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.