37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
Attributes | |
ACN | 192782 |
Time | |
Date | 199110 |
Day | Sun |
Local Time Of Day | 0601 To 1200 |
Place | |
Locale Reference | airport : 1go |
State Reference | OH |
Altitude | msl bound lower : 3000 msl bound upper : 3000 |
Environment | |
Flight Conditions | IMC |
Light | Daylight |
Aircraft 1 | |
Controlling Facilities | tracon : tol |
Operator | general aviation : personal |
Make Model Name | Small Aircraft, High Wing, 1 Eng, Fixed Gear |
Flight Phase | climbout : intermediate altitude climbout : takeoff ground : preflight |
Flight Plan | IFR |
Person 1 | |
Affiliation | Other |
Function | flight crew : single pilot |
Qualification | pilot : instrument pilot : commercial pilot : cfi |
Experience | flight time last 90 days : 20 flight time total : 338 flight time type : 116 |
ASRS Report | 192782 |
Person 2 | |
Affiliation | government : faa |
Function | controller : approach |
Qualification | controller : radar |
Events | |
Anomaly | inflight encounter : vfr in imc non adherence : clearance non adherence : far other anomaly other |
Independent Detector | other flight crewa |
Resolutory Action | none taken : detected after the fact |
Consequence | faa : reviewed incident with flight crew |
Supplementary | |
Primary Problem | Flight Crew Human Performance |
Air Traffic Incident | Pilot Deviation |
Narrative:
*Reporter departed the departure airport, having been informed the clearance delivery frequency was OTS. Reporter did not note that the clearance received with a void time was for his destination airport. After departure he attempted contact on the given frequency, which of course was wrong and in the ensuing delay flew into clouds prior to getting his requested IFR flight plan activated. Had not noticed the problem until airborne.
Original NASA ASRS Text
Title: SMA PLT DEPARTS DEP ARPT WITH WRONG CLRNC, ONE RELATIVE TO HIS DEST ARPT AND GOES IMC IN VFR FLT WHILE TRYING TO SORT OUT THE FLT PLAN FILED ERROR WITH APCH CTL.
Narrative: *RPTR DEPARTED THE DEP ARPT, HAVING BEEN INFORMED THE CLRNC DELIVERY FREQ WAS OTS. RPTR DID NOT NOTE THAT THE CLRNC RECEIVED WITH A VOID TIME WAS FOR HIS DEST ARPT. AFTER DEP HE ATTEMPTED CONTACT ON THE GIVEN FREQ, WHICH OF COURSE WAS WRONG AND IN THE ENSUING DELAY FLEW INTO CLOUDS PRIOR TO GETTING HIS REQUESTED IFR FLT PLAN ACTIVATED. HAD NOT NOTICED THE PROBLEM UNTIL AIRBORNE.
Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.