Narrative:

On jan/sat/92, blocked 6.2 hours (due to WX delays) scheduled block 4.0, reduced rest on 11 sat. Jan, sun, 1992-blocked 3.2 hours, result: block 9.4 hours in a 24 hour period with reduced rest. Problem cause: scheduling intentional reduced rest trips is wrong. Correct the situation: schedule trips with 10 hours rest minimum.

Google
 

Original NASA ASRS Text

Title: PLT FLC WORK SCHEDULE CREATED SITUATION WHEREIN FLC EXCEEDED 8 HRS FLT TIME IN A 24 HR PERIOD.

Narrative: ON JAN/SAT/92, BLOCKED 6.2 HRS (DUE TO WX DELAYS) SCHEDULED BLOCK 4.0, REDUCED REST ON 11 SAT. JAN, SUN, 1992-BLOCKED 3.2 HRS, RESULT: BLOCK 9.4 HRS IN A 24 HR PERIOD WITH REDUCED REST. PROBLEM CAUSE: SCHEDULING INTENTIONAL REDUCED REST TRIPS IS WRONG. CORRECT THE SITUATION: SCHEDULE TRIPS WITH 10 HRS REST MINIMUM.

Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.