Narrative:

West of localizer being vectored for ILS runway 3L at dtw. The vectors took us east of the localizer. We were IMC when our TCASII issued an RA of climb, climb, climb. A climb was initiated promptly, then the controller told us to climb to 6000 ft. TCASII then issued a monitor vertical speed. Level off was completed at 6000 ft. We completed the 3L ILS and landed.

Google
 

Original NASA ASRS Text

Title: HDG TRACK DEV. A FURTHER ALTDEV OCCURS AFTER TCASII RA MANDATES EVASIVE ACTION CLB.

Narrative: W OF LOC BEING VECTORED FOR ILS RWY 3L AT DTW. THE VECTORS TOOK US E OF THE LOC. WE WERE IMC WHEN OUR TCASII ISSUED AN RA OF CLB, CLB, CLB. A CLB WAS INITIATED PROMPTLY, THEN THE CTLR TOLD US TO CLB TO 6000 FT. TCASII THEN ISSUED A MONITOR VERT SPD. LEVEL OFF WAS COMPLETED AT 6000 FT. WE COMPLETED THE 3L ILS AND LANDED.

Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.